banner

spigot lighting stage Truss with Roof for Concert

Home

spigot lighting stage Truss with Roof for Concert

  • How to Install Truss System?
    May 07, 2023
    The construction process you've outlined provides a clear step-by-step guide for erecting an aluminum alloy truss structure, which is a critical task in event setup due to its importance in ensuring stability and safety during various events. Here's a concise summary and some additional points to consider:Aluminum Alloy Truss Construction Summary 1. Base Placement: Position four bases on the ground and adjust their legs for a level surface. 2. Diagonal Support Installation: Insert diagonal braces into the outer sides of the bases at each corner (2 per corner, totaling 8). 3. Reverse Head Attachment: Screw reverse heads onto the bases, ensuring their rotation direction matches the provided diagram. 4. Square Sleeve Installation: Fit square sleeves over the reverse heads. 5. Beam Assembly: Connect beams on the ground. 6. Beam-Square Set Linkage: Join the beams with the square sets, completing the beam assembly on the ground. 7. Column Truss Preparation: Connect column trusses horizontally, attaching one end to the reverse head with screws and the other to the cross arm, also connecting with a hoist for lifting. 8. Erecting Columns: Carefully raise the column trusses, avoiding excessive force, and secure the screws. 9. Beam Hoisting: Hook the hoist to the beam and lift it to align with the columns. 10. Beam Positioning: Use the hoist to maneuver the beam into position above the column heads. 11. Equipment Mounting: Install lighting and sound equipment onto the beam. 12. Final Height Adjustment: Elevate the structure to the desired height using the hoist. 13. Stabilization: Secure diagonal braces to columns and base cross arms, stabilizing the entire aluminum alloy truss structure. Additional Considerations • Safety First: Always wear appropriate PPE (Personal Protective Equipment), including hard hats, safety glasses, and gloves. Ensure all equipment is inspected before use. • Load Calculation: Prior to construction, calculate the expected load (including equipment weight, wind loads, etc.) to ensure the truss system is adequately designed and rated for the job. • Weather Conditions: Avoid setting up during adverse weather conditions such as high winds or storms to prevent accidents. • Ground Stability: Check the ground condition and, if necessary, use appropriate ground anchors or weights to stabilize the bases. • Professional Supervision: Especially for larger structures, having a professional supervisor or engineer overseeing the construction can ensure compliance with safety standards and structural integrity. • Post-Construction Inspection: Before use, conduct a thorough inspection of the entire structure to verify that all connections are secure and the structure is stable.Following these steps and considerations will contribute to a safe and efficient construction of aluminum alloy truss systems for various events and applications.
    Read More

leave a message

leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Submit

Home

Products

whatsApp

contact